Drawing & model
Use consistent revisions for the 2D drawing and 3D model.
Engineering resources
Practical checklists for comparing manufacturing routes and preparing a custom component RFQ. Use these questions to make assumptions visible before tooling and production decisions.

RFQ essentials
Use consistent revisions for the 2D drawing and 3D model.
State the alloy grade and governing specification.
Identify datums, fits, threads and mating surfaces.
Define cosmetic zones, masking and acceptance samples.
Share annual usage, first order and repeat batch quantities.
Specify tests, required reports and sample approval.
Process selection
Consider when repeated geometry and integrated features can justify tooling. Include secondary machining, finish and expected demand in the comparison.
Useful for evaluating geometry and production requirements without assuming a casting tool is justified. Review material removal, setups and repeat volume.
Cast the general form and machine selected interfaces. Review how stock allowance, porosity risk and datums connect the two processes.

Before sending the file
Identify mounting references, hole patterns, sealing faces and important geometric tolerances.
Mark cosmetic zones, forbidden witness marks and areas that need masking or special packaging.
State the test method, conditions and acceptance limit for leakage, corrosion, electrical or other functional requirements.
RFQ essentials
| Include | Why it matters |
|---|---|
| 2D drawing + 3D model | Geometry alone does not define tolerances, material or finish. Keep revisions consistent. |
| Alloy and specification | Avoid unapproved substitutions and ambiguous material equivalence. |
| Annual usage + batch quantities | Separate tooling economics from repeat-order pricing. |
| Critical dimensions + datums | Connect manufacturing, measurement and assembly function. |
| Finish + cosmetic zones | Define appearance, masking and coating effects on fits. |
| Tests + documentation | Include sample approval, functional acceptance and records. |
| Packaging + delivery condition | Protect surfaces and align with your receiving process. |
Commercial clarity
| Cost / scope item | Clarification to request |
|---|---|
| Tooling and fixtures | Ownership, included trials, maintenance responsibility and change process. |
| Piece price | Material, process route, inspection and finish included. |
| Sampling and approvals | Number of iterations, required reports and approval dependencies. |
| Packing and logistics | Protective packaging, quantity per pack and delivery terms. |
Keep exploring
Your next component
Share the available drawing and application. Identify open items so they can be discussed before the quotation is finalized.