Coordinate measuring machine in the MSdean inspection room

Quality & Inspection

Checked against
your drawing.

Dimensional, appearance and functional checks planned around your part and agreed acceptance criteria.

CMM inspection Dimensional & geometric verification

Our Certifications

Certificates and inspection reports, available for your review.

01Certificate image ISO 9001:2015 quality management system certificate
02Certificate image IATF 16949:2016 certificate of registration
03Certificate image UL Follow-Up Service Procedure

Swipe to view more

Quality checks through production

Part-specific work instructions define what to inspect, when to inspect it and the acceptance criteria for each operation.

  1. Material & setup

    Confirm the material, tooling and equipment setup before the production run.

  2. First-piece approval

    QC checks the first piece against the drawing and approved reference before production proceeds.

  3. Process inspection

    Check casting appearance, trimmed edges, machined holes and threads at defined operations.

  4. Finish verification

    Compare the finish with the approved reference and carry out the specified coating tests.

  5. Final inspection

    Review appearance, agreed dimensions and specified fit checks. Identify and separate rejected parts.

  6. Protective packing

    Use suitable trays or layer separators, then check the packing quantity and labels before release.

Operator self-checksInspector checksQC sampling

Inspection frequency, full-check items and sampling scope follow the control plan agreed for your part.

Dimensional & functional inspection

4 CMM systems 3 vision measuring systems

MSdean vision measuring system with optical measuring stage and computer

Vision Measuring

Optical dimensions and profiles.

Electrical testing station for MSdean heating components

Electrical Testing

Specified checks for heating components.

Appearance inspection by surface zone

We agree surface zones, appearance references and defect limits for your part before production.

Surface marks
Assess scratches, dents and visible spots against the approved appearance and limit samples.
Edges & form
Check burrs, gate trimming and deformation. Verify flatness where specified.
Colour & coating
Compare colour with the approved reference and inspect for bubbles, pinholes or peeling.
Logos & markings
Check clarity, position and alignment against the drawing and approved reference.

Approved reference samples

Inspectors compare parts with the agreed appearance reference and limit samples. Inspection decisions follow the criteria for each surface zone.

Polished metal bezel with detailed edges and openings

Part-specific surface zones

  • A
  • B
  • C
  • D

Zone definitions and acceptance limits are confirmed for each part.

Surface finish verification

Paint and powder coating have different requirements. We define the finish reference, test method and acceptance limits for the specified process.

Coating thickness
Measure the coating against the specified thickness range.
Colour consistency
Compare with the approved colour reference, with instrumental checks where specified.
Adhesion
Use the specified cross-cut and tape test to assess coating adhesion.
Corrosion resistance
Carry out salt spray testing for the agreed duration and assessment criteria.
Coating thickness gauge used for finish verification
MSdean salt spray chamber for specified corrosion tests

Test frequency, specimen selection and pass criteria are confirmed for the coating and part. Additional checks, such as pencil hardness or alcohol resistance, can be specified.

See surface finishing capabilities

Leak testing for sealed housings

For parts with sealing requirements, dedicated fixtures and part-specific test settings help check for leaks during production.

  • Daily reference checks

    Check the test equipment with known acceptable and rejected reference parts before continuing production.

  • Part-specific test conditions

    Define the fixture, test pressure, hold time and acceptance limit for the part and its sealing requirements.

  • Individual checks & segregation

    Parts on the specified leak-test route are checked individually. Rejected parts are identified and kept separate.

Leak inspection sequence

  1. Verify the setupConfirm the fixture and reference checks.
  2. Position & seal the partSeat the part correctly without damaging its surfaces.
  3. Pressurise & holdApply the conditions specified for the part.
  4. Evaluate & separateRelease acceptable parts and segregate rejects.
Dedicated leak testing fixture at MSdean

First-piece, in-process and last-piece checks follow the specified inspection plan. Test coverage and required records are agreed for your project.

See assembly and testing capabilities

Inspection records
you can review.

Agree the inspection scope, sampling plan and required records before production.

  • Dimensional results

    Key dimensions and geometric features as agreed.

  • Material documents

    Material grade and related documentation as required.

  • Specified test results

    Records for agreed tests, such as corrosion and electrical checks.

Report contents and additional testing are confirmed for your part and order.

Product protection through handling and packing

The packing method follows the part geometry, finished surfaces and agreed shipping requirements.

  1. Inspect before packing

    Only accepted parts move into final packing. Check appearance, finish and the specified dimensions against the agreed reference.

  2. Separate individual parts

    Use the specified formed trays, protective bags or wrapping to prevent contact between vulnerable surfaces.

  3. Protect each layer

    Use the defined separators and handling method during transfer. Keep rejected parts identified and stored separately.

  4. Check quantity and labels

    Confirm the packing quantity and match the label to the contents before closing the container.

Aluminum housings separated in a formed protective tray
Keyboard housing in a dedicated blue transfer tray

Part-specific packing: tray design, protective materials and quantities are confirmed for each project.

Let’s define the checks for your part.

Send your drawings, critical requirements and the reports you need.

Get in touch

Discuss your project

Share your part drawing, material and expected quantity.

Portfolio preview. This form is for demonstration only.